Cinderbed Rd Newington VA!

Industrial Wherehouse demising wall, new bathroom, new office. Electrical and HVAC work.

Reston VA.

Bento house restaurant complete interior fit out outcome!

Terminal Rd,
Lorton VA.

Interior tenant offices remodeling. Bathrooms,  Ceilings, Flooring, Lighting, store front door repairs, Finishes and Painting. 

CHEROKEE AVE.

Build some new partition walls and new door along with a new small kitchen. Install a new glass entrance door and glass partition wall. Repair and paint all interior walls. Install new VCT flooring glue-down engineer wood flooring and carpet. Install new cabinets and counter tops electrical modification. Run new plumbing pipe and connections for a new bathroom.

                 BEFORE

               

                 AFTER

45681 Oakbrook Court.

Interior remodeling demolition of existing carpet some partition walls and build in counter. Demolition of kitchen , cabinets and ceramic floors all plumbing fixtures to be replaced all lighting fixtures, switches & plugs to be replaced. Repair and paint all interior walls install new glue-down engineer hardwood floor.  Install new commercial carpet at set of stair. Install new kitchen ,cabinets and counter top.

   

               BEFORE

   

               AFTER

City of Richmond,

Byrd Park Round House hard wood flooring installation project!

CITY OF RICHMOND, JOSEPH BRYAN PARK.

Rebuild public restroom with the CMU & Install two new metal doors.

CITY OF RICHMOND, BLANTON HOUSE.

Installation of new Hardwood floors 3/4 x 5″ Gasnton Select Oak Smooth Solid Hardwood.

Northern Virginia Community College
TYLER BUILDING ROOF REPAIR

The project consists of the partial Tear-Off of existing low slope roofing system where moisture was observer below the membrane and replacement with new wind vented Single-Ply EPDM roofing, membrane on mechanically  attached tapered Polyisocyanurate roof insulation to match existing roofing systems.
Removal of existing metal parapet copings and metal counter-flashing around perimeter of roof areas and replacement with new metal  Construction to match existing. Removal and replacement of roof drains.

Virginia Beach Building Roof Replacement at Tidewater
Community College, Virginia Beach Campus.

The project is generally described as the complete roof replacement of the VB Building. The VB  Building has a roof area of 35,772 sf. Demolition work includes the removal of the existing low-slope, single-ply EPDM membrane roof system including insulation and edge metal, down to the existing sloped metal roof deck. New work includes the installation of a two-ply SBS-modified bitumen roof system. The new roof system includes the installation of wood blocking, poly-isocyanurate rigid board insulation, a high-density perlite cover board, edge metal, flashings, and primary and overflow roof drains and associated drain piping.

BUILDING 39 ROOF REPLACEMENT, CENTRAL STATE HOSPITAL.

Project scope includes removal of existing roof system of approximately 66,500 SF. The roofing will be replaced with 60 mil, single-ply fully adhered EPDM system. The work also includes replacement of metal coping, metal edges, guard rails as well masonry work on parapet walls.

POCAHONTAS MIDDLE SCHOOL, HENRICO VA

SCOPE OF WORK

Remove existing roof down to concrete to concrete substrate and scraped off all residues. New cavgrip underlayment was applied to concrete deck fallow  by new polyisocyanurated insulation adhered with approved manufacturer fast adhesive. EPDM membrane was fully adhered installed with approve bonding adhesive.

CASCADE SHOPPING CENTER EXTERIOR REPAIRS & PAINING 

SCOPE OF WORK

Repairs several damages areas along the facade and trim around  the building. prepared all areas and applied   two new coats of exterior paint.

         

          BEFORE

          AFTER

OLD TOWN ALEXANDRIA

SCOPE OF WORK

Remove existing damage mortar from wall area and sealant as it was failing and causing water intrusion. New mortar joint was applied to the wall in full depth as well new joint sealant. Brick wall was also washed off using acid liquids at the end.

SAINT ANDREW’S UNITED METHODIST CHURCH

SCOPE OF WORK

Complete demolition of existing roof shingles down to substrate plywood provide and install new synthetic underlaymen and new CertainTeed  dimensional asphalt shingles  as well gutter and downspouts replacement.

           BEFORE

           AFTER

PROJECT  AT VIRGINIA  STATE  UNIVERSITY 

SCOPE OF WORK 

is to repair slate roof on all gable eves along with the trim work. Installation of new through wall and bolted steel outrigger along with interior welded support to beams. Also repair, paint all wood soffit and to repair hidden copper gutter system around the building.

ISLE OF WIGHT COUNTY SCHOOL  BOARD

SCOPE OF WORK

Portion of asphalt shingle removal including plywood over metal deck. As well the removal of build up flat roof area. New system is a cool vented plywood over polyisocyanurated installed and fastened over metal decking along with new asphalt shingle. The flat roof area will be cover up with a new fully adhere PVC roofing membrane.

PINE CAMP REC.COMMUNITY CENTER (CITY OF RICHMOND)

SCOPE OF WORK 

Pine camp recreational center. Project scope includes removal of existing roof system and replace with a new PVC membrane system as well mechanical air conditioning and heat units duct work modifications along with roof drains replacements.

Holiday Inn estructural and light gauge framing entrance canopy.

Wall rain system panels, Window concrete lintels metal flashing around the building, Walls parging and stamp concrete entrance.
New enclosed 4000 SF deck pavilion with new electrical main electrical service along with exterior grade recessed lights fixtures as well exterior grade ceiling fans. Deck was built using pressure treated wood, composite deck boards and composite trim to wrap up posts and beams around the deck. Roof was built using Engineer trusses, 3/4” plywood and Architectural asphalt shingles. Ceiling was enclose with new exterior paintable drywall. A new concrete slab was also built on the front portion of the deck pavilion and new gutter/Downspout with underground drainage piping.

Complete removal of IPE deck boards, fiber trim, brick, floor joists and replacement of exterior glass mat gypsum wall sheathing from the entire tiers. Installation of new through wall flashing, new waterproofing applications as per manufacturer requirements.